Simply as an exercise to see if I could do it, I have tried to produce a double track crossover.  The basics were not difficult but the check rails were somewhat complex resulting in many partial templates.

Anyone with more knowledge than I care to comment on its viability?

Regards

Raymond


Be an idea to add the box file!!
Attachment: attach_1012_1434_double_junction_5.box 337
Last edited on 28 Mar 2011 13:55 by Raymond
posted: 28 Mar 2011 16:20

from:

mike47j
 
 

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides
As someone with less knowledge that you, I don't see the point of the check rails with names like check3, check3a, check5, check5b.

In the GWR switch and crossing practice book, these are opposite a central frog, but in your case they are away from that frog.

Mike Johnson

posted: 28 Mar 2011 17:26

from:

Raymond
 
Bexhill-on-sea - United Kingdom

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides
Hi Mike,

There has to be some form of name or finding them to work on among lots of 'no-name' would be irksome.

Not sure what you mean about the positon of the check guards but looking at the picture on page 91 I think the crossing angles and the fact mine is on a curve would make some differences.

Regards

Raymond

posted: 28 Mar 2011 18:15

from:

mike47j
 
 

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides
Sorry, for the ambiguous question. Its not the names that I have a problem with, its the check rails. They seem to serve no purpose since they are not opposite the frogs.

After a quick experiment I think its the increased separation of the tracks that is the main cause of this. The angle and curvature don't seem to have much effect.

Before,I did not understand note 2 on page 91 as its does not appear relavant to the diagram. However, in your diagram it clearly is relavant as many of your wing rails are also check rails for other frogs.

Mike Johnson

posted: 28 Mar 2011 18:18

from:

Paul Boyd
 
Loughborough - United Kingdom

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides
Hi Raymond

it must be the season for scissor crossings!  Have a look at the thread topic 1406 and you'll see how I've done it.  Basically, loads of partial templates...  Don't look too closely at the timbering!

There's no right or wrong way to get the same end result, and as it's the end result that matters, who cares how you get there? :D

posted: 29 Mar 2011 00:42

from:

Ian Allen
 
Milton Keynes - United Kingdom

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides
Raymond,

Here is a scissor crossover still being worked on by myself. As you can see I have temporarily removed 4 check rails until such time as I build up separate templates.

Ian
Attachment: attach_1024_1434_Coulsdon_Scissor_11_03_29_0010_29.box 306

posted: 29 Mar 2011 07:44

from:

Raymond
 
Bexhill-on-sea - United Kingdom

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides
Hi Ian,

Why have you chosen four different crossing angles, are you following prototype plan?

Regards

Raymond

posted: 29 Mar 2011 09:37

from:

Les G
 
 

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides

Raymond wrote:
There has to be some form of name or finding them to work on among lots of 'no-name' would be irksome.

Not sure what you mean about the positon of the check guards but looking at the picture on page 91 I think the crossing angles and the fact mine is on a curve would make some differences.

An ambitious effort Raymond, well done; you are well ahead of me in your mastery of Templot.

My current level of understanding of formation geometry comes from study of LNER practice. [Standard railway equipment-permanent way 1926, from NERA ]  I do not have the GWR publication.

You asked for comment, so here goes. The check rails at 700-75; 700-160; 1060-140; and 1050-200 do appear to be redundant in the formation as pointed out by Mike 47j. 

Clicking on "26.check5a", I note that only half of the check rail is high lighted. This suggests that these check rails appear as a result of using multiple templates rather than from prototype practice. ie The redundant common crossing they protected has been removed during the cut and paste process but leaving the check in place.

I see that there are guide lines associated with checks 3a,and ?; 5 and 5a which converge to positions between the roads, were these a part of your original setting out? 

  I assume there is a means to eliminate unwanted elements from the drawings, but I have yet not got that far in my study, thankyou for sharing your progress.

regards

Les G
Last edited on 29 Mar 2011 18:44 by Les G
posted: 29 Mar 2011 11:09

from:

Ian Allen
 
Milton Keynes - United Kingdom

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides

Raymond wrote:
Hi Ian,

Why have you chosen four different crossing angles, are you following prototype plan?

Regards

Raymond

Hi Raymond,

The different crossing angles allow the trackwork to be designed so that the curves flow more smoothly through the scissors and to maintain curving radii above a 6' minimum. I was also conscious of not wanting stock to lurch through the crossing. On the prototype, there were many instances of pointwork being designed and built to fit a specific location when "stock" parts wouldn't fit or suffice.

Ian


 

posted: 29 Mar 2011 11:17

from:

Stephen Freeman
 
Sandbach - United Kingdom

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides
There do as Les says, appear to be some redundant check rails. The diamond vees are perhaps a little too opposite to the turnout vees, which could result in a 'double drop' best to be offset a little.

posted: 29 Mar 2011 13:17

from:

Raymond
 
Bexhill-on-sea - United Kingdom

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides
I'll take another look at them but the check rails are present in GWR practice so need to be present on the model.

They are made up from multiple templates and fitted by eye so the centre lines may well look off.

Regards

Raymond (Not Ray please)

posted: 29 Mar 2011 13:51

from:

mike47j
 
 

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides
I'm not convinced that those check rails were always present, the picture on page 56 has some but not all.

I think the key to not getting 2 v crossings inline with wider track spacing, is to offset the diamond as in that photo.

Mike Johnson

posted: 29 Mar 2011 16:10

from:

Raymond
 
Bexhill-on-sea - United Kingdom

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides

mike47j wrote:
I'm not convinced that those check rails were always present, the picture on page 56 has some but not all.

I think the key to not getting 2 v crossings inline with wider track spacing, is to offset the diamond as in that photo.

Mike Johnson


Thanks for that Mike.  I have revisisted it in the light of your comments and that picture and, starting from scratch, redrawn the whole thing asymetrically and it seems to work.  Here are the tracks.  I have yet to add timbers but that is easy enough.

This took a couple of hours whereas the first one took days.

Regards

Raymond
Attachment: attach_1027_1434_double_junction_6.box 283

posted: 29 Mar 2011 16:22

from:

Stephen Freeman
 
Sandbach - United Kingdom

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides
I think you need a few check rails as well. Have a look at scissors on my website
Last edited on 29 Mar 2011 16:24 by Stephen Freeman
posted: 29 Mar 2011 17:15

from:

Raymond
 
Bexhill-on-sea - United Kingdom

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides

Borg-Rail wrote:
I think you need a few check rails as well. Have a look at scissors on my website


Thanks Stephen,

I make it two required, extended wing rails and I think that covers everything.  Now the timbering is done as well.

Regards

Raymond
Attachment: attach_1028_1434_double_junction_7.box 257

posted: 29 Mar 2011 20:23

from:

mike47j
 
 

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides
Sorry. I think you need one more. The diamond V crossing on the right does not have a check rail above it.

Mike Johnson

posted: 30 Mar 2011 09:00

from:

Raymond
 
Bexhill-on-sea - United Kingdom

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides

mike47j wrote:
Sorry. I think you need one more. The diamond V crossing on the right does not have a check rail above it.

Mike Johnson


Then if so, it needs at least one more at the other end. Whether similar would be needed at the other two sides I don't know but pictures in "Switch & Crossing Practice" suggests not.  Anyway, I have found a way more accurately to fit these fiddly things in place as here.

My thanks to everyone for their invaluable (as always) help.

Regards

Raymond
Attachment: attach_1029_1434_double_junction_8.box 254

posted: 30 Mar 2011 14:56

from:

Les G
 
 

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides
Hi Raymond,

It is my observation that check rails are used opposite crossing vees to eliminate the risk of sideways movement of the wheel axle resulting in derailment.  It follows that having a formation where vees are exactly opposite would result in rough running or a derailmant risk due to the lack of lateral contraint of the axle.

Mike Johnson drew attention to the the right hand diamond crossing, logic suggests that you are right, and there should also be one on the other side of it.  Extending the wing rail of crossover 4 would probably do the trick.

Again,  Thankyou for sharing

Les G



about Templot Club

Templot Companion - User Guide - A-Z Index Templot Explained for beginners Please click: important information for new members and first-time visitors.
indexing link for search engines

back to top of page


Please read this important note about copyright: Unless stated otherwise, all the files submitted to this web site are copyright and the property of the respective contributor. You are welcome to use them for your own personal non-commercial purposes, and in your messages on this web site. If you want to publish any of this material elsewhere or use it commercially, you must first obtain the owner's permission to do so.
The small print: All material submitted to this web site is the responsibility of the respective contributor. By submitting material to this web site you acknowledge that you accept full responsibility for the material submitted. The owner of this web site is not responsible for any content displayed here other than his own contributions. The owner of this web site may edit, modify or remove any content at any time without giving notice or reason. Problems with this web site? Contact webmaster@templot.com.   This web site uses cookies: click for information.  
© 2020  

Powered by UltraBB - © 2009 Data 1 Systems