Author | Message |
---|
Clicked a link? Wrong message? Wait until the page has finished loading, click in the address bar and then press the Enter key. This is a timing bug in some browsers. |
1st message | this message only |
posted: 18 Mar 2019 17:25 |
|
from: |
Keith Newton
view images in gallery
view images as slides
|
Can Templot change a Double Slip into a Barry slip?
__________ message ref: 26837
|
|
Clicked a link? Wrong message? Wait until the page has finished loading, click in the address bar and then press the Enter key. This is a timing bug in some browsers. |
2nd message | this message only |
posted: 18 Mar 2019 19:58 |
|
from: |
Martin Wynne
view images in gallery
view images as slides
Please do not send requests for help direct to me via email or PM.
Post your questions on the forum where everyone can see them and add helpful replies.
|
Keith Newton wrote: Can Templot change a Double Slip into a Barry slip? Hi Keith,
Do you mean you want to model a prototype double slip which has been rationalised to a Barry slip?
Or do you simply want to create a Barry slip from scratch? In that case there is no requirement for the diverging roads to align, as in a double slip.
There are some instructions here and subsequent posts:
http://85a.co.uk/forum/view_topic.php?id=1356&forum_id=6#p8400
cheers,
Martin.
__________ message ref: 26838
|
|
Clicked a link? Wrong message? Wait until the page has finished loading, click in the address bar and then press the Enter key. This is a timing bug in some browsers. |
3rd message | this message only |
posted: 18 Mar 2019 20:33 |
|
from: |
Keith Newton
view images in gallery
view images as slides
|
Hello Martin
I had already included a double slip in my Templot plan and have been told now that for prototypical operation I only need the slips and one way crossing. hence I wondered if I could convert to a Barry slip easily, or do I need to start from scratch?
__________ message ref: 26839
|
|
Clicked a link? Wrong message? Wait until the page has finished loading, click in the address bar and then press the Enter key. This is a timing bug in some browsers. |
4th message | this message only |
posted: 18 Mar 2019 20:49 |
|
from: |
Martin Wynne
view images in gallery
view images as slides
Please do not send requests for help direct to me via email or PM.
Post your questions on the forum where everyone can see them and add helpful replies.
|
Keith Newton wrote: I had already included a double slip in my Templot plan and have been told now that for prototypical operation I only need the slips and one way crossing. hence I wondered if I could convert to a Barry slip easily, or do I need to start from scratch? Hi Keith,
Delete the slip roads and slip switches, so that you are back to a diamond-crossing.
Then change each half-diamond to a turnout: template > convert half-diamond to turnout menu item.
Put the peg on CTRL-6 before making any other changes, otherwise you will lose the alignment between the two diverging roads.
On a 1:6 Barry slip, change to A switches rather than B.
On each one, you may want to increase the crossing entry straight ( action > mouse actions: control/real > adjust V-crossing entry straight menu item, SHIFT+F11) to reduce the lead length until the switch tips clear the opposite check rails.
Some timber shoving will be needed. Try to preserve the timber positions under each switch.
Are you happy with that, or do you need a bit of video?
cheers,
Martin.
__________ message ref: 26840
|
|
Clicked a link? Wrong message? Wait until the page has finished loading, click in the address bar and then press the Enter key. This is a timing bug in some browsers. |
5th message | this message only |
posted: 18 Mar 2019 21:06 |
|
from: |
Keith Newton
view images in gallery
view images as slides
|
Thanks Martin
Just tried above, I was ok until I put the peg on CTRL-6?
Did you mean put the peg on CTRL-6 before doing SHIFT+F11 or before changing to an A switch?
Also, I am using Midland Railway BH 12ft straight heel switch - does that make a difference?
Keith
__________ message ref: 26843
|
|
Clicked a link? Wrong message? Wait until the page has finished loading, click in the address bar and then press the Enter key. This is a timing bug in some browsers. |
6th message | this message only |
posted: 18 Mar 2019 21:27 |
|
from: |
Martin Wynne
view images in gallery
view images as slides
Please do not send requests for help direct to me via email or PM.
Post your questions on the forum where everyone can see them and add helpful replies.
|
Hi Keith,
Put the peg on CTRL-6 before making any other changes, otherwise you will lose the alignment between the two diverging roads. (I have now edited my previous post.)
For 1:6 turnouts with straight switches you will probably want to change to 9ft or 10ft switches rather than 12ft. Otherwise the turnout radius will be very tight. 12ft is probably ok at 1:7.
Blank the turnouts up to the switch toe, at do > blank up to switch toe menu item.
If necessary, shorten the check rail to span only 4 timbers, to make more space for the switch tips, real > adjust check rails menu item.
cheers,
Martin.
__________ message ref: 26844
|
|